Giken ECO1400 S Silent Piler Contractor Services – New Orleans, Louisiana

London Avenue Canal Project Using Giken ECO 1400S Silent Piler for Permanent Seepage Cutoff Wall in New Orleans, Louisiana

The Press-In System (using Giken ECO1400 S Silent Piler) was used to install a permanent seepage cutoff wall in New Orleans, Louisiana. The Press-In System was specified by the owner to address vibration concerns for the nearby residences. Primary access was limited to barges to supply material and crane support behind the floodwalls. A total of 9,000 wall feet of sheeting was installed within 4 months meeting the US Army Corps of Engineers June 01, 2011, Target Deadline for 100-yr storm level protection as part of the HSDRRS. The sheet piles were driven through dense sands and buried tree stumps without any major issues during driving.

  • Type of Project: Flood Control
  • Purpose of Piling: Permanent Seepage Cutoff Wall
  • Site Location: New Orleans, Louisiana
  • Duration of Work: February – June 2011
  • Owner: US Army Corps of Engineers, Hurricane Protection Office
  • Main Contractor: Integrated Pro Services, LLC
  • Piling Contractor: Blue Iron Foundations and Shoring, LLC
  • Equipment Used: ECO1400 S / SCZ675WM Silent Piler
  • Sheet Pile Material: Gerdau PZC18 / PZC19
  • Sheet Pile Supplier: LB Foster – New Orleans Office
  • Download Project PDF

LET’S WORK

NO PROJECT TOO BIG OR SMALL







    Sheet Piling Borehole Data

    Borehole data are direct measurements of temperature from boreholes drilled into the Earth’s crust. In Louisiana, you have multiple layers of sand located beneath the Ocean. Every geological area has different Borehole data so it’s important to hire a Giken Silent Piler Permanent Seepage Cutoff Wall contractor that has the experience you can depend on to understand the earth’s surface. For this ECO1400 S Silent Piler Permanent Seepage Cutoff Wall project, we piled through 2 layers of the seafloor: Dense Fine Sand and Firm – Stiff Clay. We piled Nucor PZC18 / PZC19 sheets into the ocean floor at L=53ft – 59ft. Blue Iron, LLC has the Giken Silent Piler experience you can depend on to finish the job at hand. Whether you are in the Gulf Coast of Louisiana or in the heart of Central Louisiana, Blue Iron, LLC can help.

    • Seafloor Layers: 2
    • Seafloor Material 1: Dense Fine Sand
    • Seafloor Material 2: Firm to Stiff Clay
    • Borehole Depth: L=53ft – 59ft

    Giken Silent Piler Bulkhead Walls & Seawalls & Retaining Walls

    For homeowners located throughout Louisiana, permanent bulkhead walls and seawalls are incredibly important for maintaining the structural integrity and foundation of their real estate. Many Shoreline residences are constantly impacted and stressed from water flow, seasonal storms, and high tides. If you have been impacted by seasonal storm, your current sea wall was under-engineered, or you are looking for structural repairs to your retaining wall, give us a call. We specialize in Seawalls, Bulkheads, Lake Walls, Retaining Walls, and much more using top-of-the-line equipment like the Giken Silent Piler. If you are a homeowner looking for Giken Silent Piler walls or a contractor looking to rent a Giken Silent Piler, we can help. We provide new installations and repair services as well. You can trust blue Iron LLC as your premiere Giken Silent Piler contractor throughout Louisiana.

    Permanent Bulkhead Wall Contractor Services in Louisiana

    • Giken Silent Piler Services
    • Seawalls & Retaining Walls
    • Hybrid Concrete Walls
    • Giken Sheet Piling
    • Louisiana Seawalls
    • Louisiana Bulkhead Walls
    • Louisiana Lake Walls
    • Concrete Retaining Walls
    • Vinyl Sheet Piling
    • Seawall Erosion Repair

    Contact Our Florida Office To Request a Quote