Emergency Repair

Giken ECO1400 S Silent Piler Contractor Services – New Orleans, Louisiana

LPV117 Emergency Repair Project Using Giken ECO 1400S Silent Piler for Permanent Cutoff Wall in New Orleans, Louisiana

The Press-In System (using Giken ECO1400 S Silent Piler) was used to install a permanent cutoff wall in New Orleans, Louisiana. The Press-In Method for sheeting installation was specified into the project plans due to unusually hard local ground conditions which had caused previous projects to fail. The advanced Water Jet System was utilized in conjunction with the Silent Piler in order to successfully achieve full embedment depth regardless of the ground conditions.

  • Type of Project: Emergency Repair
  • Purpose of Piling: Permanent Cutoff Wall
  • Site Location: New Orleans, Louisiana
  • Duration of Work: February 2010
  • Owner: USACE
  • Main Contractor: Shavers – Whittle Construction, LLC
  • Piling Contractor: Blue Iron Foundations and Shoring, LLC
  • Equipment Used: ECO1400 S Silent Piler
  • Sheet Pile Material: Gerdau Ameristeel PZC19 L=55ft N=250pr
  • Sheet Pile Supplier: LB Foster
  • Download Project PDF

LET’S WORK

NO PROJECT TOO BIG OR SMALL







    Sheet Piling Borehole Data

    Borehole data are direct measurements of temperature from boreholes drilled into the Earth’s crust. In Louisiana, you have multiple layers of sand located beneath the Ocean. Every geological area has different Borehole data so it’s important to hire a Giken Silent Piler Emergency Repair contractor that has the experience you can depend on to understand the earth’s surface. For this ECO1400 S Silent Piler Flood Control project, we piled through 1 layer of the seafloor: Silty Clay. We piled PZC19 sheets into the ocean floor at L=55ft. Blue Iron, LLC has the Giken Silent Piler experience you can depend on to finish the job at hand. Whether you are in the Gulf Coast of Louisiana or the Northern region of Louisiana, Blue Iron, LLC can help.

    • Seafloor Layers: 1
    • Seafloor Material: Silty Clay
    • Borehole Depth: L=55ft.

    Giken Silent Piler Bulkhead Walls & Seawalls & Retaining Walls

    For homeowners located throughout Louisiana, permanent bulkhead walls and seawalls are incredibly important for maintaining the structural integrity and foundation of their real estate. Many Shoreline residences are constantly impacted and stressed from water flow, seasonal storms, and high tides. If you have been impacted by seasonal storm, your current sea wall was under-engineered, or you are looking for structural repairs to your retaining wall, give us a call. We specialize in Seawalls, Bulkheads, Lake Walls, Retaining Walls, and much more using top-of-the-line equipment like the Giken Silent Piler. If you are a homeowner looking for Giken Silent Piler walls or a contractor looking to rent a Giken Silent Piler, we can help. We provide new installations and repair services as well. You can trust blue Iron LLC as your premiere Giken Silent Piler contractor throughout Louisiana.

    Permanent Bulkhead Wall Contractor Services in Louisiana

    • Giken Silent Piler Services
    • Seawalls & Retaining Walls
    • Hybrid Concrete Walls
    • Giken Sheet Piling
    • Louisiana Seawalls
    • Louisiana Bulkhead Walls
    • Louisiana Lake Walls
    • Concrete Retaining Walls
    • Vinyl Sheet Piling
    • Seawall Erosion Repair

    Contact Our Florida Office To Request a Quote