Sheet Pile Installation

Giken ECO1400 S Silent Piler Contractor Services – Jefferson Parish, Louisiana

LPV9.2 Lakefront Protection Project Using Giken ECO 1400S Silent Piler for Permanent Cutoff Wall in Jefferson Parish, Louisiana

The Press-In System (using Giken ECO1400 S Silent Piler) was used to install a permanent cutoff wall in Jefferson Parish, Louisiana. Prior to our involvement, the sheeting on this project was being installed with a vibratory method. Issues with noise caused the owner and the contractors to seek methods such as the Press-In System to mitigate those complaints from nearby residents in a relatively affluent area. Utilizing this system, work has been conducted in the nighttime as well as typical daytime hours.

  • Type of Project: Sheet Pile Installation At Lake Pontchartrain Pump Stations
  • Purpose of Piling: Permanent Cutoff Wall As Part of T-Wall
  • Site Location: Jefferson Parish, Louisiana
  • Duration of Work: January 2011 – 2013
  • Owner: USACE
  • Main Contractor: Odebrecht / CJ Mahan
  • Piling Contractor: Blue Iron Foundations and Shoring, LLC
  • Equipment Used: ECO1400 S Silent Piler
  • Sheet Pile Material: Gerdau Ameristeel PZC13 & PZC26 L=25ft – 65ft N=1,100pr
  • Sheet Pile Supplier: LB Foster
  • Download Project PDF

LET’S WORK

NO PROJECT TOO BIG OR SMALL







    Sheet Piling Borehole Data

    Borehole data are direct measurements of temperature from boreholes drilled into the Earth’s crust. In Louisiana, you have multiple layers of sand located beneath the Ocean. Every geological area has different Borehole data so it’s important to hire a Giken Silent Piler Sheet Pile Installation contractor that has the experience you can depend on to understand the earth’s surface. For this ECO1400 S Silent Piler Sheet Pile Installation project, we piled through 1 layer of the seafloor: Clay. We piled Gerdau Ameristeel PZC13 & PZC26 sheets into the ocean floor at L=65ft. Blue Iron, LLC has the Giken Silent Piler experience you can depend on to finish the job at hand. Whether you are in the Gulf Coast of Louisiana or the Northern region of Louisiana, Blue Iron, LLC can help.

    • Seafloor Layers: 1
    • Seafloor Material: Clay
    • Borehole Depth: L=65ft.

    Giken Silent Piler Bulkhead Walls & Seawalls & Retaining Walls

    For homeowners located throughout Louisiana, permanent bulkhead walls and seawalls are incredibly important for maintaining the structural integrity and foundation of their real estate. Many Shoreline residences are constantly impacted and stressed from water flow, seasonal storms, and high tides. If you have been impacted by seasonal storm, your current sea wall was under-engineered, or you are looking for structural repairs to your retaining wall, give us a call. We specialize in Seawalls, Bulkheads, Lake Walls, Retaining Walls, and much more using top-of-the-line equipment like the Giken Silent Piler. If you are a homeowner looking for Giken Silent Piler walls or a contractor looking to rent a Giken Silent Piler, we can help. We provide new installations and repair services as well. You can trust blue Iron LLC as your premiere Giken Silent Piler contractor throughout Louisiana.

    Permanent Bulkhead Wall Contractor Services in Louisiana

    • Giken Silent Piler Services
    • Seawalls & Retaining Walls
    • Hybrid Concrete Walls
    • Giken Sheet Piling
    • Louisiana Seawalls
    • Louisiana Bulkhead Walls
    • Louisiana Lake Walls
    • Concrete Retaining Walls
    • Vinyl Sheet Piling
    • Seawall Erosion Repair