Flood Control

Giken ECO1400 S Silent Piler Contractor Services – St. Bernard Parish (New Orleans), Louisiana

USACE – LPV148.02 Floodwall Project Using Giken ECO 1400S Silent Piler for Permanent Steel Sheet Pile Cutoff Wall (T-Wall) in St. Bernard Parish (New Orleans), Louisiana

The Press-In System (using Giken ECO1400 S Silent Piler) was used to install a permanent steel sheet pile cutoff wall (t-wall) in St. Bernard Parish (New Orleans), Louisiana. Blue Iron Foundations and Shorings were awarded the sheeting for sections 6 and 8 of the LPV148.02 Floodwall project. The overall project is an 8-mile floodwall founded on steel H piles with a steel sheet pile cutoff wall. The small compact footprint of the leader mast was tracked on top of the levee while other systems required a large support crane. Blue Iron was able to double the production from the other piling contractors on site.

  • Type of Project: Flood Control
  • Purpose of Piling: Permanent Steel Sheet Pile Cutoff Wall (T-Wall)
  • Site Location: St. Bernard Parish (New Orleans), Louisiana
  • Duration of Work: October 2010 ~ November 2010
  • Owner: US Army Corps of Engineers, Hurricane Protection Office
  • Main Contractor: Cajun Constructors, Inc.
  • Piling Contractor: Blue Iron Foundations and Shoring, LLC
  • Equipment Used: ABI TM22 w/ 1200V / RTG RG21T w/ MRV125
  • Sheet Pile Material: PZ23.6 L=41ft
  • Sheet Pile Supplier: Skyline Steel, LLC. – New Orleans Office
  • Download Project PDF

LET’S WORK

NO PROJECT TOO BIG OR SMALL







    Sheet Piling Borehole Data

    Borehole data are direct measurements of temperature from boreholes drilled into the Earth’s crust. In Louisiana, you have multiple layers of sand located beneath the Ocean. Every geological area has different Borehole data so it’s important to hire a Giken Silent Piler Permanent Steel Sheet Pile Cutoff Wall (T-Wall) contractor that has the experience you can depend on to understand the earth’s surface. For this ECO1400 S Silent Piler Permanent Steel Sheet Pile Cutoff Wall (T-Wall) project, we piled through 2 layers of the seafloor: Soft and Firm Clay and Sand. We piled Nucor PZ23.6 sheets into the ocean floor at L=41ft. Blue Iron, LLC has the Giken Silent Piler experience you can depend on to finish the job at hand. Whether you are in the Gulf Coast of Louisiana or in the heart of Central Louisiana, Blue Iron, LLC can help.

    • Seafloor Layers: 2
    • Seafloor Material: Soft and Firm Clay and Sand
    • Borehole Depth: L=41ft

    Giken Silent Piler Bulkhead Walls & Seawalls & Retaining Walls

    For homeowners located throughout Louisiana, permanent bulkhead walls and seawalls are incredibly important for maintaining the structural integrity and foundation of their real estate. Many Shoreline residences are constantly impacted and stressed from water flow, seasonal storms, and high tides. If you have been impacted by seasonal storm, your current sea wall was under-engineered, or you are looking for structural repairs to your retaining wall, give us a call. We specialize in Seawalls, Bulkheads, Lake Walls, Retaining Walls, and much more using top-of-the-line equipment like the Giken Silent Piler. If you are a homeowner looking for Giken Silent Piler walls or a contractor looking to rent a Giken Silent Piler, we can help. We provide new installations and repair services as well. You can trust blue Iron LLC as your premiere Giken Silent Piler contractor throughout Louisiana.

    Permanent Bulkhead Wall Contractor Services in Louisiana

    • Giken Silent Piler Services
    • Seawalls & Retaining Walls
    • Hybrid Concrete Walls
    • Giken Sheet Piling
    • Louisiana Seawalls
    • Louisiana Bulkhead Walls
    • Louisiana Lake Walls
    • Concrete Retaining Walls
    • Vinyl Sheet Piling
    • Seawall Erosion Repair