Beam & Lagging Benefits
- This support system offers versatility and can be designed as a cantilever system, braced system or tied-back system
- The drilling method ensures low noise and vibration during installation
- Piles can be placed using low overhead equipment
- The design supports extremely deep excavations when using bracing and tieback anchors
- The shoring face can serve as a backform for permanent concrete walls
- The surface of the soldier piles and lagging is suitable for placing waterproofing
Standard Operations Phase 1
Soldier beams and lagging constitute a reliable earth retention system commonly employed in civil engineering and construction projects to stabilize excavations and prevent soil movement. Soldier beams are vertical steel beams strategically installed along an excavation perimeter prior to excavation. These beams provide crucial structural support. Lagging, often made of timber, steel, or concrete panels, is then installed horizontally between the soldier beams, creating a barrier that holds back the soil. The interaction between the soldier beams and lagging distributes lateral earth pressures and facilitates safe excavation.
Standard Operations Phase 1
Soldier beams and lagging constitute a reliable earth retention system commonly employed in civil engineering and construction projects to stabilize excavations and prevent soil movement. Soldier beams are vertical steel beams strategically installed along an excavation perimeter prior to excavation. These beams provide crucial structural support. Lagging, often made of timber, steel, or concrete panels, is then installed horizontally between the soldier beams, creating a barrier that holds back the soil. The interaction between the soldier beams and lagging distributes lateral earth pressures and facilitates safe excavation.
Standard Operations Phase 2
Phase 2: Beams can be vertically driven or drilled into the ground. Typically, they are spaced at regular intervals between 6 and 10 feet. Once the beams are in place, excavation progresses in lifts. These wall systems are designed to limit or reduce horizontal soil movement behind the wall. Cantilever walls do not require any additional bracing. For increased stability or deeper excavations, tiebacks, bracing, and anchors can be used for additional reinforcement.
Lagging walls are horizontal supports that prevent soil from moving into an excavation as work progresses. Blue Iron uses common lagging materials such as shotcrete, timber, and precast concrete panels to create both permanent and temporary wall systems.
Standard Operations Phase 2
Phase 2: Beams can be vertically driven or drilled into the ground. Typically, they are spaced at regular intervals between 6 and 10 feet. Once the beams are in place, excavation progresses in lifts. These wall systems are designed to limit or reduce horizontal soil movement behind the wall. Cantilever walls do not require any additional bracing. For increased stability or deeper excavations, tiebacks, bracing, and anchors can be used for additional reinforcement.
Lagging walls are horizontal supports that prevent soil from moving into an excavation as work progresses. Blue Iron uses common lagging materials such as shotcrete, timber, and precast concrete panels to create both permanent and temporary wall systems.
Key Features and Benefits
- Affordability: The construction of soldier pile and lagging is considerably more cost-effective than other earth retention systems, which is very beneficial being that excavations are primarily temporary.
- Minimal Noise Disturbances: Soldier beams and lagging have very laborious installation techniques, however, the actual installation process is comparably soundless to alternative wall retention solutions.
- Speed: Because soldier beam and lagging walls are short-term projects for construction sites, they’re easy to construct and deconstruct.
- Control and Versatility: The versatility of the construction materials allows builders freedom and control over the layout and spacing of the soldier piles, making any type of last-minute change of plans or adjustments feasible.
Key Features and Benefits
- Affordability: The construction of soldier pile and lagging is considerably more cost-effective than other earth retention systems, which is very beneficial being that excavations are primarily temporary.
- Minimal Noise Disturbances: Soldier beams and lagging have very laborious installation techniques, however, the actual installation process is comparably soundless to alternative wall retention solutions.
- Speed: Because soldier beam and lagging walls are short-term projects for construction sites, they’re easy to construct and deconstruct.
- Control and Versatility: The versatility of the construction materials allows builders freedom and control over the layout and spacing of the soldier piles, making any type of last-minute change of plans or adjustments feasible.
The Beam & Lagging Solution
Soldier beam and lagging earth retention wall systems find application in a variety of building plans, serving both temporary and permanent solutions in residential and commercial applications.
For short-term solutions, soldier beams and lagging provide excavation support during different construction phases using cost-effective materials, which expedite project completion dates. For long-term solutions, you can modify construction materials along with installation techniques.
Whether you are involved in home construction, foundation repairs, or archaeological digs, soldier beams and lagging offer a versatile temporary or permanent installation solution.
The Beam & Lagging Solution
Soldier beam and lagging earth retention wall systems find application in a variety of building plans, serving both temporary and permanent solutions in residential and commercial applications.
For short-term solutions, soldier beams and lagging provide excavation support during different construction phases using cost-effective materials, which expedite project completion dates. For long-term solutions, you can modify construction materials along with installation techniques.
Whether you are involved in home construction, foundation repairs, or archaeological digs, soldier beams and lagging offer a versatile temporary or permanent installation solution.