Type of Project
Earth Retention for New Structures
Purpose of Piling
Temporary Shoring
Equipment Used
ABI TM 22 & ECO1400 S Silent Piler

Provided design-build shoring for P/E Flow Splitter Structure, including installation of three levels of tieback anchors and internal waler bracing for a 41’ deep excavation. During construction the existing access road behind the shoring system remained open without restrictions thus allowing other construction to continue without being impacted. Due to the “hard pan” layers encountered at the site, we installed the sheet pile the using the Giken 1400 with Auger Crush System and in turn, successfully installed 50’ sheet piles while maintaining continuous interlock to pile tip depth.