Type of Project
Beam & Lagging for Basement
Purpose of Piling
Temporary Shoring
Equipment Used
ABI TM 22

Installation of 788 LF of beam shoring with one row of tiebacks and 12,000 SF of 3”x12” wood lagging for a basement. The cut depths varied up to 20 ft below ground surface.