Type of Project
Stormwater Retention
Purpose of Piling
Permanent Cofferdam
Equipment Used
ECO1400 S Silent Piler

The Silent Piler was used to install the steel sheet pile cofferdam / causeway to minimize the impact to the operating themed attraction as well as the very tight tolerances required. The entire causeway was designed based on a radius the entire length. The permanent structure required precise installation to allow for the precast concrete panels to be installed after installation. The steel sheet piles are carrying the entire bridge load from walkways above.

Our Commitment

LET’S WORK TOGETHER

NO PROJECT TOO BIG OR SMALL